Home > Operations > Before Vessel Arrival

Before Vessel Arrival (Click arrows to view process2)

  • 24/7 operations
    1.
    Our terminal facilities in Hong Kong operate 24x7 throughout the year. We have dedicated teams to make vessel and barge berthing arrangements.
  • Before a vessel arrives
    2.
    Before a vessel arrives in Hong Kong, MTL receives detailed information regarding the loading and unloading list as well as other cargo details. Shipping lines will also make onward declarations for all containers to be handled in Hong Kong.
  • Terminal operating system generates the discharge and loading sequence for operations
    3.
    MTL’s Terminal Operating System generates the discharge and loading sequence and container handling equipment deployment plan for both quayside and yard operations.
  • Barge operators or shipping lines make container transaction requests
    4.
    Barge operators or shipping lines make requests for container delivery/collection and associated container declarations via OnePort’s Common Barge Platform.
  • External truck driver makes appointments for container collection
    5.
    External truck drivers make appointments for container collection by phone.
Back to top